China National Art Museum Phase II Expansion Project
Design Description of Architectural Bidding Scheme
1 Overall planning
1.1 East West Axis
On the Jingshan Mountain north of the Forbidden City, five beautiful pavilions form an east-west axis together; The old museum of the first phase of the art museum ingeniously continues this axis. It echoes the pavilion on the top of Jingshan Mountain with the pyramidal roof roof at four corners, making the building organically integrate into the urban environment.
In the planning and design of the second phase expansion of the new building, this east-west axis was once again emphasized. The axis highlights the circular roof of the central exhibition hall, the main entrance in the west, the water pool between the new and old buildings, and the lotus bridge, which naturally combine the second phase new building with the first phase old building into a beautiful landscape of the city.
1.2 North South axis
The first phase of the old building has a clear north-south axis, reflecting the traditional Chinese symmetrical layout. Its intersection with the east-west axis is the highest point of the entire building.
The second phase new building also forms a symmetrical pattern with a north-south axis. The intersection of its two axes is the center of the circular roof of the central exhibition hall, which is also the highest point of the second phase building. However, it is lower than the roof of the first phase old building, reflecting respect for the old building.
1.3 Street View
In the design, the street view of the first and second phases of the art museum was taken into consideration from Wusi Street and Donghuang Chenggen Site Park. The golden roof of the first phase and the circular roof of the central exhibition hall of the second phase are the most eye-catching. The sculpture square to the south reflects the cultural temperament of the art museum, while the water scenery and greenery to the west complement the exquisite architecture of the art museum.
The southwest corner of the second phase of the art museum has been designed with a rooftop garden, which not only allows people to enjoy beautiful urban scenery such as the Forbidden City and Jingshan Mountain from above, but also becomes an urban landscape. It decorates the corners of the city and adds a touch of green to the May Fourth Square and the Imperial City Heritage Park in the sky.
2. Functional layout of the overall plan
1.1 This design continues to use the south main entrance of the old building, while the greenery and parking lot on the north side remain largely unchanged.
The Phase 2 new building is located to the west of the Phase 1 old building, 34 meters south of the red line, about 30 meters north of the red line, about 10 meters west of the red line, about 10 meters east of the red line, and about 38 meters from the main building of the old building.
Between the east side of the new Phase II building and the old Phase I building is a cultural square, equipped with a shallow water pool and a bridge connecting the two buildings.
The south side of the Phase 2 new building is designed as a sculpture square, which is integrated with the sculpture garden on the south side of the old building. The sculpture square is stacked in a stepped shape.
To the west of the Phase 1.5 new building is the main entrance and a large area of water.
The north side of the Phase 2 new building is the secondary entrance, mainly used for the entry and exit of motor vehicles and non motor vehicles, with above ground parking spaces and underground garage entrances and exits arranged.
3 General Layout Traffic Organization
3.1 The south side of the second phase of the art museum is Wusi Street, and the west side is Donghuangchenggen Road. There are 17 bus routes surrounding it, making transportation convenient.
3.2 Motor vehicles can enter from the south entrance of the old building or from the northwest corner of the new building. Along the loop between the old and new buildings, vehicles can easily reach the two ramps for entering and exiting the underground garage.
3.3 Bicycles mainly enter from the northwest corner of the new building and enter the bicycle parking garage through the bicycle ramp on the north side of the new building.
Visitors to the old museum mainly enter through the original south entrance, while visitors to the new museum mainly enter through the west entrance. The two groups of visitors can communicate through the Lotus Bridge between the two museums.
3.5 Logistics office personnel mainly enter the base from the northwest corner of the new building, and then enter the building through the logistics personnel entrances to the north of the two buildings.
4 Greening planning
4.1 By utilizing the distance from the setback line of the building, a green area is formed on the south side of the old and new buildings, with sculptures as the theme, creating a green corridor for citizens to enjoy and relax. This also allows the new and old buildings to be hidden among a green tree.
Between the old and new buildings, there is a green cultural square adorned with a pool, small bridge, and stage, which can be used for both leisure and cultural gatherings.
4.3 The north side of the old building, the north side and the west side of the new building, as well as the areas outside the roads and parking lots, will be used as green land to expand the green area as much as possible.
The bamboo corridor of the old building is a major feature of the old building, and the new building echoes it with bamboo balconies, interweaving greenery and architecture.
The southwest corner and central axis roof of the new building are designed with two rooftop gardens, adding a natural touch to the building.
5 Planning Land Use and Technical and Economic Indicators
5.1 Planning Land Use
The National Art Museum of China is located on Wusi Street, northeast of the Forbidden City, Dongcheng District, Beijing. The first phase of the art museum, completed in 1962, is an important national landmark building. The expansion site of the second phase is located on the west side of the old museum, south of Wusi Street, west of Donghuangchenggen Site Park, north of Xiaojiao Hutong, and east of the old museum.
The construction site is approximately 90 meters wide in the east-west direction and 140 meters long in the north-south direction. The planning requires the building to retreat no less than 10 meters from the west red line and no less than 34 meters from the south red line. The construction land area is approximately 17600 square meters.
5.2 Economic and Technical Indicators
Architectural use nature: Museum building
Structural design service life: over 100 years
Seismic fortification intensity: 8 degrees seismic fortification
Fire resistance rating of building: Level 1
Civil air defense category: Level 5
Land area: approximately 17600 square meters
Civil air defense area (estimated): 4800 square meters
Number of floors: 3 above ground and 1 underground
Floor Area Ratio: 1.43
Building density: 52.0%
Building height: 16.8 meters
Green space ratio: 30.2%
Motor vehicle parking spaces: a total of 403 vehicles
Among them, there are 51 above ground vehicles (including 3 large buses) in Phase 1
(Phase II) 65 vehicles above ground (including 10 large buses) and 287 vehicles underground
Bicycle parking spaces: 1150 vehicles
6 individual building schemes
6.1 Design Concept
6.1.1 "Treasure Box of Art"
In China, there is a tradition of using treasure boxes to collect family heirlooms and valuable items, and their production process is as exquisite and delicate as the things stored inside. The process of opening the treasure box is a process of uncovering the mysterious veil of the treasure layer by layer, and it is also a fun exploration process.
Only by using magnificent and dazzling containers can precious treasures be matched. Therefore, in line with the national level art treasures displayed in the art museum, the architecture of the art museum should also be exquisite and dazzling.
6.1.2 "Ink City"
Traditional Chinese painting uses water and ink to create paintings, because only water and ink can express the infinite artistic conception of the universe using only two simple colors - "black" and "white".
The use of water and ink in traditional Chinese painting also reflects the philosophical thinking of China, that is, all things in the universe are composed of emptiness and reality, but emptiness and reality do not exist independently of each other, but are intertwined with reality in emptiness and reality in reality. Derived from architectural art, it refers to the alternation and integration of internal and external spaces.
6.2 Design Techniques
The design of the second phase of the National Art Museum of China is a reflection of these two concepts.
The second phase of the art museum's individual building is designed as an "artistic treasure box", a landmark sculpture that endows cultural connotations. It is a beautifully carved Chinese antique box, precisely cut and infused with cultural vitality, connecting the inside and outside, and the new and the old.
The design of the second phase of the art museum's individual building consolidates the internal space into square blocks, forming the physical form of the building. A gap is drawn between each two blocks to create a semi outdoor balcony. In this way, the outdoor space is regularly interspersed within the indoor space, enriching the spatial hierarchy and making it a highlight of leisure atmosphere.
7 functional zoning of individual buildings
7.1 Functional zoning
The first floor plan includes the entrance hall, central exhibition hall, temporary exhibition hall, social education area, business research area, administrative office area, security area, and comprehensive service area.
The second and third floor plans include basic and themed exhibition halls, as well as a rooftop courtyard.
The roof layout features a distinctive restaurant and rooftop garden.
The underground plan includes the collection storage area, garage, and equipment area.
7.2 Spatial organization
The organization of indoor spaces adopts the principle of alternating between internal and external elements, forming outdoor breakpoints in each indoor space. Visitors can take a break there while enjoying the city scenery and surrounding gardens.
The public corridors horizontally and vertically connect different exhibition spaces. All exhibition areas are connected to the central exhibition hall. The shared space between the central exhibition hall and the temporary exhibition hall is filled with fresh air and natural sunlight, reflecting the grandeur of a national art museum.
Internal traffic organization of 8 individual buildings
8.1 Visitor flow
Visitors can enter from the western entrance or from the bridge connected to the old building on the east side. They can enter the magnificent central exhibition hall through the entrance hall. From the central exhibition hall to the north, it is convenient to enter the temporary exhibition hall with two levels of height. From the northwest and southeast corners of the central exhibition hall, visitors can access the basic and special exhibition halls on the second and third floors.
The second and third floors are the basic and thematic exhibition halls. The northern exhibition hall adopts a series arrangement, and visitors follow the series route. The southern exhibition hall adopts a parallel arrangement, and visitors can choose to enter any exhibition hall to visit.
8.2 Flow of people for communication activities
Participants in academic exchange activities can directly enter the multifunctional hall and academic lecture hall on the first floor from the outside. And can enter the logistics office area from the north side of the building for meetings.
8.3 Staff Flow Line
Logistics office personnel enter from the entrance on the north side of the building and can enter other areas such as the exhibition area through the corridor.
8.4 exhibits streamline
The large truck transporting exhibitions enters the exhibition loading and unloading area from the ramp of the underground garage, and then transports them to the exhibition areas on each floor through the cargo elevator on the east side of the building.
9 Professional Design and Fire Protection, Civil Air Defense, Energy Conservation and Environmental Protection Design
9.1 Structural Design
1. In order to avoid affecting the main structure of the old building and reduce disturbance and damage to the old building structure, the newly constructed part is completely separated from the original building from the foundation to the upper structure under the premise of continuous space between the old and new parts.
2. According to the characteristics of this project, the new structure is proposed to adopt a fully cast-in-place reinforced concrete frame shear wall structure, and steel structures will be used for local areas such as the temporary exhibition hall in the middle and the roof of the central exhibition hall.
3. Mainly using stairs and elevator shafts to install reinforced concrete shear walls. The underground garage is made of ordinary reinforced concrete structure and beam slab system. Due to the large column grid size, ordinary reinforced concrete columns and floor slabs, as well as prestressed reinforced concrete beams, are planned to be used for the above ground part to reduce the structural height.
4. Due to the large span of the temporary exhibition hall in the middle and the roof of the central exhibition hall, and to meet the needs of the building design, steel structures are proposed to be used.
5. The foundation is planned to use reinforced concrete raft foundation and natural foundation.
9.2 Water supply and drainage design
9.2.1 Water supply system
A. Water source: Domestic and fire-fighting water is supplied by two municipal pipelines with a municipal pressure of 0.2Mpa. It is arranged outdoors as a DN150 circular pipeline network, and water meters are installed on the two water supply inlet pipes.
B. Water supply system
a) Adopt differentiated water supply according to usage requirements:
Serial number
System Classification
Usage
source
1
Domestic water supply
Washing, catering, and air conditioning cooling water supply
municipal pipe network
2
reclaimed water
Toilet flushing, greening irrigation, floor flushing
Reuse of wastewater after treatment
b) Domestic water supply is not divided into zones and is directly supplied using municipal water supply pressure.
c) Reclaimed water system: According to the requirements of the Beijing Water Conservation Office documents, a reclaimed water system is required for this project. The reclaimed water treatment equipment is located in the underground reclaimed water room, using integrated treatment equipment to treat wastewater, which is then supplied by a variable frequency speed regulating water pump for flushing and greening irrigation; Install water hydrants or underground water hydrants around underground garages and outdoor roads for ground flushing. The reclaimed water system is not partitioned.
9.2.2 Hot water:
A. Set up a hot water room in the basement, equipped with a set of domestic hot water supply facilities, providing 600 ° C domestic hot water for toilets, restaurants, and other auxiliary rooms.
B. Heat source: Municipal heat is used as the heat source for heat exchange.
C. Hot water system: The system partition is the same as the domestic water supply system, and the domestic hot water adopts mechanical circulation to maintain the temperature of the hot water in the pipeline network.
9.2.3 Drainage system:
The drainage system adopts a rainwater, sewage, and wastewater diversion system.
A. The drainage system includes:
a) Domestic sewage discharge system: toilet fecal sewage discharge
b) Domestic wastewater collection system: including collection of washing and bathing wastewater
c) Rainwater system: including roof rainwater discharge and ground rainwater discharge.
B. Wastewater is collected as a source of reclaimed water, collected and discharged into the wastewater regulating pool located in the basement reclaimed water room. After physical and biochemical treatment, it is reused as reclaimed water.
C. Fecal and sewage are treated in septic tanks and discharged into municipal sewage pipes. The catering wastewater is discharged into the municipal sewage pipe after oil separation treatment.
D. The basement sewage is discharged into the collection pump pit, and after being lifted by the pump, it is discharged into the municipal rainwater and sewage pipes.
E. Special sewage treatment equipment shall be installed for repairing, photography, and other special polluted wastewater, and the treated wastewater shall be discharged into the municipal sewage pipe.
F. Rainwater system:
a) The rainwater on the roof is collected and discharged into the municipal rainwater pipeline through pipelines.
b) Rainwater discharge from outdoor green spaces, roads, and hard paved areas should consider infiltration as much as possible, and excess water should be collected and discharged into municipal rainwater pipes through rainwater outlets and pipelines.
9.2.4 Circulating water system:
This project is equipped with an outdoor landscape water pool and adopts a circulating water treatment system. Install a circulating water pump and filtration equipment in the basement with a circulation cycle of 12 hours.
9.3 HVAC Design
9.3.1 Indoor and outdoor design calculation parameters:
1. Outdoor design calculation parameters:
Altitude
31.2 m
atmospheric pressure
102.04kPa in winter and 99.86kPa in summer
Calculation of dry bulb temperature for summer air conditioning
33.2 ℃
Summer air conditioning calculation wet bulb temperature
26.4 ℃
Summer ventilation calculation temperature
30 ℃
Calculation of relative humidity for summer ventilation
64%
Calculation of dry bulb temperature for winter air conditioning
-12 ℃
Calculation of relative humidity for winter air conditioning
45%
Winter ventilation calculation temperature
-5 ℃
Calculated temperature for winter heating
-9 ℃
Maximum wind direction in winter
NNW and N
Average outdoor wind speed in winter
2.8m /s
Average outdoor wind speed in summer
1.9m /s
Maximum depth of frozen soil
85cm
2. Indoor design calculation parameters:
Room Name
summer
winter
Minimum fresh air volume
Or ventilation rate
Building area, personnel density
Equipment lighting load
Indoor
noise
Remarks
temperature
℃
humidity
%
temperature
℃
humidity
%
m 3 / ( h . p )
w/m 2
Exhibition Area
25 ± 2
55 ± 5
20 ± 2
50 ± 5
20
4
20
Collection warehouse
20 ± 1
50 ± 5
20 ± 1
50 ± 5
30
40
10
front-of-warehouse area
20 ± 1
50 ± 5
20 ± 1
50 ± 5
30
40
10
office
25 ~ 27
≤ 65
20 ~ 22
≥ 35
40
10
40
reading room
25 ~ 27
≤ 65
20 ~ 22
≥ 35
35
12
25
meeting room
24 ~ 26
≤ 65
20 ~ 22
≥ 35
20
3.5
20
Academic Lecture Hall
24 ~ 26
≤ 65
19 ~ 21
≥ 30
25
According to the seat
20
Security Center
24 ~ 26
≤ 60
19 ~ 21
≥ 30
50
25
50
Research building for cultural relic protection
24 ~ 26
≤ 60
20 ~ 22
≥ 40
50
15
45
Cultural relics management building
25 ~ 27
≤ 65
20 ~ 22
≥ 30
40
12
20
Public restroom
27 ~ 29
16 ~ 18
12 times/hour
transformer and distribution room
≤30
≥10
8 times/hour
Refrigeration room
≤30
≥10
5 times/hour
Heat exchange station
≤30
≥10
10 times/hour
Water Treatment Room
≤30
≥10
10 times/hour
pump room
≤30
≥10
5 times/hour
parking garage
6 times/hour
9.3.2 HVAC System Cold and Heat Source Design
The overall heating and air conditioning load of this project is about 3750Kw, and the heat source adopts urban heating pipelines. Set up a centralized heat exchange station in the basement to prepare hot water for air conditioning at 60-50 ℃ required for this project. The building area of the heat exchange station is about 135 square meters, and the building height is not less than 4.5 meters.
2. The overall air conditioning cooling load of this project is about 4300Kw. A refrigeration room is installed in its basement, including three 400 ton screw chillers, which provide 7-12 ℃ chilled water for air conditioning to meet the annual cooling demand for the entire project in summer, some internal areas, and constant temperature and humidity air conditioning. One of the 400 ton screw chiller units can operate during transitional seasons and even winter to ensure the annual cooling load demand of the building's internal area and some constant temperature and humidity cultural relics warehouses.
3. During the coldest times, cooling towers and heat exchange units can be used to directly prepare chilled water for winter air conditioning, in order to save electricity consumption during the operation of the chiller unit in winter. The building area of the refrigeration room is about 420 square meters, and the building height is not less than 5.4 meters.
4. During summer and transitional seasons, the heat from air conditioning cooling water can be utilized to preheat the replenishment of domestic hot water to above 30 ℃ through plate heat exchangers; Only during the coldest season of winter, when the cooling tower is no longer in use, municipal heat is directly used to prepare domestic hot water. This can greatly save the energy consumption of domestic hot water.
9.3.3 Air conditioning water system design
1. The air conditioning system in this project adopts a four pipe water system for cold and hot water, with a constant water temperature and variable water flow system on the load side, and a constant flow system on the cold and heat source side. Install a pressure differential bypass device between the supply and return water main pipes. All end of pipe air conditioning equipment consists of four pipe air conditioning units and four pipe fan coil units. Install local low-temperature hot water floor heating systems on the ground of the temporary exhibition hall on the first floor and the central exhibition hall.
2. The winter air conditioning humidification system of this project adopts different humidification methods due to the different installation and usage functions. For general rooms without process requirements, such as offices, meeting rooms, catering, sales and other areas, wet film or high-pressure water spray humidification with lower operating costs shall be adopted. For collection warehouses with strict humidity requirements, electric humidification is used to meet their humidity accuracy requirements. For large exhibition halls, it is recommended to use a combination of wet film humidification and electric heating humidification. The wet film humidifies the air to 30-40%, and then the electric heating humidifies it to the required humidity
9.3.4 Design of Air Conditioning and Ventilation System
1. For rooms with high temperature and humidity accuracy requirements such as collection warehouses and exhibition halls, this project adopts a fixed fresh air volume all air system design. The air conditioning unit will be equipped with functions such as filtration, mixing, electronic purification treatment, cooling, heating, humidification, ultraviolet disinfection, etc., to maintain the constant temperature and humidity requirements required for such rooms. Separate air conditioning systems are installed in the front area of the warehouse and the collection warehouse.
2. For comfort air conditioning systems in large spaces such as multifunctional halls, book reading rooms, academic lecture halls, audience image halls, and lecture halls without strict temperature and humidity precision control requirements, independent variable fresh air volume to fresh air operating constant air volume all air systems are designed. For scattered small rooms such as administrative offices, property management, and comprehensive service areas, a four pipe fan coil unit with fresh air air conditioning system is designed to meet the personalized adjustment requirements of different rooms.
3. Install energy recovery devices with total heat exchange on the exhaust side of air conditioning systems such as exhibition and listening to save energy consumption of fresh air. Mechanical ventilation or exhaust systems are installed in public restrooms and mechanical and electrical equipment rooms.
4. Due to the fact that the majority of collection warehouses use gas fire extinguishing systems, no fire exhaust system is installed. In case of a fire, the ventilation system of the warehouse should be turned off and stopped. But the warehouse also needs to be equipped with an exhaust system for removing fire extinguishing gases after firefighting.
5. In addition to maintaining a certain room temperature and humidity, separate mechanical exhaust systems should be installed in the disinfection and repair rooms of the business research area to eliminate pollutants during work and maintain a weak negative pressure in the room.
6. The underground parking garage shall be equipped with a ventilation system for normal use and a mechanical smoke exhaust system for use in case of fire, in accordance with the requirements of the "Code for Fire Protection Design of Garage, Repair Shop, and Parking Lot". The mechanical exhaust and smoke exhaust system is set up according to the fire zone, and the system exhaust and smoke exhaust air volume is determined based on 6 air changes per hour. The normal air supply system of the underground garage serves as supplementary air for the mechanical smoke exhaust system in case of a fire, and the supplementary air volume is not less than 50% of the smoke exhaust air volume.
9.4 Electrical Design
The National Art Museum of China is a national level art museum, and its electrical load belongs to the first level load; Security and prevention belong to first level risk units, and security measures are designed according to first level protection; Design intelligent systems according to Class A standards for intelligent buildings; Consider safety measures for fire alarm according to special grade.
9.4.1 Power Distribution System
1.1 Power Supply: This project draws two independent 10KV power sources from the municipal power supply to provide power simultaneously, serving as backups for each other. Install diesel generator sets separately to supply fire protection loads and important loads.
1.2 Transformer and distribution capacity: 4000KVA, equipped with 2 × 2000KVA dry-type transformers.
1.3 Self provided power supply: Considering special circumstances or accidents, one 800KW diesel generator set is installed as a backup power supply in case of emergency.
1.4 Uninterruptible Power Supply: Provide uninterruptible power supply (UPS) for systems such as information networks, security, fire protection systems, etc. that do not allow intermittent power supply.
1.5 Distribution System: This project adopts 10KV and 0.4/0.23KV secondary distribution. 10KV distribution adopts radial distribution, 0.4/0.23KV distribution mainly adopts radial distribution, and trunk distribution is supplemented by mixed distribution.
1.6 Lighting System: High quality lighting system should be adopted, taking into account the characteristics of the art museum. The exhibition area lighting for collections and valuable exhibits should provide good visual effects for the audience, while minimizing the damage of artificial lighting to valuable exhibits, so as to provide the best protection for cultural relics displays and collections. In the exhibition area, a combination of general lighting and local lighting is used, and modern computer control technology is applied for dimming control of human lighting and human walking to save energy and protect exhibits. All public systems adopt centralized automatic light control systems for energy efficiency and ease of management.
1.7 Lightning Protection and Grounding: This project is designed with lightning protection devices for Class II lightning protection buildings. All distribution systems and weak current systems are equipped with devices to prevent lightning wave intrusion. The entire building is connected to all metal structures and pipes at a total equipotential, and local equipotential connections are used in special humid and harsh environments to ensure the safety of personnel and property inside the building. The building adopts a joint grounding method, and the grounding resistance should be less than 0.5 ohms.
1.8 Outdoor Lighting: As this project is an expansion project, its outdoor lighting should be coordinated and unified with the outdoor lighting of the old art museum as a whole. The control system should also be able to independently control and unify the control of both museums.
9.4.2 Weak current system
2.1 Security Prevention System: Please refer to the Key Technology and Art section for details
2.2 Building Intelligence System:
According to the characteristics of this project, it is necessary to adopt a fully intelligent building management system. Intelligent management includes automatic control of building equipment operation and equipment operation management of building equipment operation history records, conditions, etc. It is a modern means to ensure the normal operation of building equipment and maintain indoor environment.
2.3 Intelligent Art Museum System:
This project belongs to a national level art museum and should aim for a digital art museum. It should establish an art museum computer network centered on an information system, including art museum data collection, processing, communication, transmission, production, storage systems, and public display and consultation systems. The implementation should be carried out step by step from small to large, from local to overall.
2.4 Communication Infrastructure:
The infrastructure of communication includes the transmission, exchange, sending, and receiving systems of voice, data, images, movies, and text within buildings, as well as between the interior and exterior of buildings. It is the infrastructure of information systems. To meet the requirements of high speed, speed, convenience, safety, reliability, and accuracy.
2.5 Satellite and Cable TV System:
Introduce cable TV programs from the city's cable TV network through fiber optics and receive user required programs wirelessly through satellite TV. The received TV programs are distributed to each user through front-end devices. Establish a television network for adjacent frequency transmission within the building.
2.6 Conference System:
Install remote conference systems, simultaneous interpretation systems, video and audio systems, and conference control systems (including intelligent control of the conference venue, environment, sound, light, and electricity according to the needs of the conference process) in the required conference rooms and halls.
2.7 Integration of intelligent systems, utilizing modern advanced technology to integrate independent networks as much as possible to establish a resource sharing and unified management system.
9.5 Fire Protection Design
9.5.1 General layout fire protection design
A. The west and south sides of the Phase II expansion project of the National Art Museum of China are enclosed by urban roads, which facilitate the arrival of fire trucks in case of fire emergencies.
B. To the north of the building, there is a fire truck access road within the construction site, with a minimum width of 9 meters. To the east of the building, a fire loop can be formed by utilizing the fire access road with the old building of the first phase of the art museum.
C. Around the building, fire truck access or green spaces can be used for firefighting. The fire extinguishing surface conditions designed in this plan are good.
D. The total length of the east-west direction of the second phase expansion project of the National Art Museum of China and the first phase old museum has reached 232 meters. According to the relevant provisions of the "Code for Fire Protection Design of High rise Civil Buildings", fire lanes must be set up. This design utilizes the fire escape on the west side of the original Phase I old building, with a platform in the pool for fire trucks to pass through.
9.5.2 Building Fire Protection Design
A. Basement section: The area of each fire compartment in the garage shall not exceed 4000 square meters; The area of each fire compartment in other areas shall not exceed 1000 square meters.
B. Above ground section: The central exhibition hall is divided into a separate fire compartment, while the rest is divided into two fire compartments on each floor, each with an area of no more than 5000 square meters.
C. All doors between fire compartments shall be Class A fire doors or fire-resistant rolling shutters with a fire resistance rating of 3 hours. The front doors of evacuation stairs and fire elevators are equipped with Class B fire doors, and the doors of pipe shafts are equipped with Class C fire doors.
9.5.3 Fire water supply system:
A. This project is calculated based on one fire. If the fire hydrants, sprinkler system storage tanks, water pumps and other facilities of the renovated Phase I art museum can meet the needs of this project and can be used together, the fire water supply of this project can be directly connected from Phase I. If the first phase of the fire water supply system cannot meet the requirements of this project, the fire water supply system needs to be reset according to the following requirements, namely setting up a fire water pool and a fire water pump room in the basement.
B. Fire water consumption
System Name
Water consumption L/s
Fire duration h
Total water usage m 3
Water supply method
Outdoor fire hydrant system
30
2
216
Direct supply of municipal pipeline network
Indoor fire hydrant system
20
2
144
Fire water storage tank
Automatic sprinkler fire extinguishing system
28
1
101
Fire water storage tank
C. Fire water storage tank: A dedicated fire water storage tank is installed in the basement, supplied by two municipal water sources through an outdoor loop pipe. The pool stores 245 m3 of indoor fire water, including 3 hours of indoor fire hydrant water and 1 hour of automatic sprinkler fire extinguishing system water.
D. Fire hydrant system
1. Outdoor fire hydrant system
a) The outdoor fire hydrant system is directly supplied with water by the outdoor fire ring pipe network.
b) Install outdoor underground fire hydrants with a protection radius of no more than 120 meters and 150 meters.
2. Indoor fire hydrant system
a) An indoor fire hydrant system is installed in the building, which is not partitioned and uses temporary high-pressure water supply. The pressure of the pipeline network is usually stabilized by two stabilizing pumps and a set of pressure tanks located in the underground fire pump room. Fire hydrant booster pump, one for backup and one for use, located in the basement fire pump room; The system is equipped with two sets of water pump couplings outdoors. To avoid overpressure at low flow rates, the fire pump adopts a variable flow stabilized fire pump.
b) The indoor fire hydrant adopts DN65 fire hydrant with self rescue reel.
E. Automatic sprinkler fire extinguishing system
1. Except for places with a clear height greater than 8 meters and places where water is not suitable for firefighting, automatic sprinkler fire extinguishing systems shall be installed.
2. The underground garage, exhibition area, front area, and library use pre action automatic sprinkler systems, while the rest use wet automatic sprinkler systems.
3. The automatic sprinkler fire extinguishing system has one backup and one in use booster pump, located in the basement fire pump room. The pressure of the pipeline network is usually stabilized by two stabilizing pumps and a set of pressure tanks located in the underground fire pump room. To avoid overpressure at low flow rates, a variable flow stabilizing fire pump is selected for the sprinkler pump. Two sets of water pump couplings are installed outdoors.
4. The alarm valve is located in the basement fire pump room.
F. Other fire protection systems:
1. Gas fire extinguishing systems that have no destructive effect on the environment are used for fire protection in the collection warehouse, temporary storage area in front of the warehouse, framing and restoration room in the business research area, etc.
2. This project is equipped with fire extinguishers at a medium hazard level. The underground garage is equipped with 35B trolley type ammonium phosphate dry powder fire extinguishers. The remaining areas are equipped with 5A portable ammonium phosphate dry powder fire extinguishers.
3. It can be determined whether to install an automatic water cannon fire extinguishing system or a large space intelligent active sprinkler fire extinguishing system in the central exhibition hall and temporary exhibition hall according to the requirements of the fire performance analysis conclusion.
9.6 Civil Air Defense Design
9.6.1 This plan includes a civil air defense project on the basement level, designed according to the five level civil air defense system, combining peacetime and wartime. The total construction area of the civil air defense project is estimated to be 4800 square meters.
According to the design principle of combining peacetime and wartime, civil air defense engineering is used as a garage in peacetime and restored as a personnel shelter or material warehouse during wartime.
9.6.3 The civil air defense engineering design of this project will further clarify the building area, protection level and other requirements of the civil air defense engineering according to the specific design requirements of the civil air defense management department, and carry out in-depth design in accordance with the relevant specifications of civil air defense engineering design.
9.7 Energy saving and Environmental Protection Design
9.7.1 This project adopts FREE COOLING's free refrigeration system in winter, which directly prepares cold water for winter air conditioning through cooling towers and heat exchange systems, thereby reducing and avoiding the operation of winter chiller units.
9.7.2 Use air conditioning cooling water to heat and replenish domestic hot water during summer and transitional seasons, reducing the heat consumption of the domestic hot water system.
9.7.3 According to the different functional requirements of the air conditioning system, various humidification forms should be adopted to minimize electric heating or electrode humidification as much as possible, saving engineering distribution capacity and humidification costs.
9.7.4 Adopt the air conditioning reheating method mainly based on hot water coil reheating, minimizing or avoiding electric reheating as much as possible, thereby saving engineering distribution capacity and reheating costs.
9.7.5 All HVAC operating equipment should use high-performance, low-noise energy-saving products. Cold water units, air conditioning chilled water pumps, cooling water pumps, air conditioning hot water pumps, etc. must use shock-absorbing foundations, while air handling units, ventilation fans, etc. must be installed with shock-absorbing foundations or suspension brackets. The connection between air conditioning water pipes and water pumps, as well as the connection between ventilation ducts and air handling units or fans, should use flexible short pipes.
9.7.6 Adopting water-saving water appliances:
9.7.7 The washbasin and urinal are equipped with induction faucets
9.7.8 Use foot operated flushing valve for toilet flushing
9.7.9 Shower adopts automatic temperature control mixer and foot operated switch
9.7.10 Green spaces adopt soil moisture sensors and automatic sprinkler/drip irrigation equipment
9.7.11 Adopt a wastewater collection, treatment, and reuse system to collect and reuse washing, showering, and rainwater for toilet flushing and landscaping irrigation.
9.7.12 The heating of domestic hot water primarily uses solar water heaters to save energy consumption and reduce exhaust emissions.
9.7.13 Except for the use of recycling and reuse measures for roof rainwater, rainwater infiltration should be considered as much as possible for other areas to reduce rainwater discharge and improve the water ecological environment.
9.7.14 The gas fire extinguishing system uses fire extinguishing agents that have no destructive effect on the environment.
9.7.15 The diesel generator room adopts sound insulation and noise reduction measures to reduce noise to the level allowed by regulations.
9.7.16 The diesel generator set adopts a unit that meets environmental protection requirements for smoke exhaust.
9.7.17 The exhaust duct of the diesel generator adopts a muffler to reduce the exhaust noise below the specified range.
A large number of steel structural components and reinforced main materials (such as carbon fiber sheets, chemical structural adhesives, etc.) that have passed national environmental protection testing were used in the design of the new structure on 9.7.18
10 Architectural Appearance Art Effects and Urban Landscape
10.1 Appearance Art Effect
10.1.1 External Wall Surface
The exterior wall of the second phase of the art museum is mainly composed of three parts: the lower part, the middle part, and the upper part. They are divided horizontally along the strip shaped skylight window. The lower part is a serrated stone vertical wall and a glass curtain wall embedded in the wall. The central part is a light yellow stone with the same color as the first phase of the art museum. The top is a metal panel with shallow relief and dark patterns, which will be jointly created by artists and architects.
10.1.2 Sunroof
A large number of skylights were designed in the second phase of the building: inverted conical skylights, seven diamond shaped skylights, glass skylights in the roof courtyard, circular small skylights, curved strip windows, and horizontal strip corner windows. During the day, they introduce sunlight into the indoor space, and at night, the lights inside the building shine through it, illuminating the night sky of the city, making the entire building sparkling and crystal clear, like a brilliant crystal palace set with diamonds.
10.2 Urban Landscape
The golden roof of the first phase of the art museum and the circular roof of the central exhibition hall in the second phase will together become the most eye-catching street view here. The rooftop garden at the southwest corner of the Phase II building not only allows people to enjoy beautiful urban scenery such as the Forbidden City and Jingshan Mountain from above, but also decorates this urban street corner, adding a touch of light green to the May Fourth Square and the Imperial City Ruins Park at a higher level.
The new National Art Museum of China has been completed and will join hands with the old museum to present a brand new look to the world, becoming a renowned landmark building in Beijing.
11 Key Technologies and Arts
11.1 Natural Lighting in the Exhibition Hall
Lighting design is an important part of exhibition design. This design combines natural and artificial lighting to provide soft, comfortable, and rich lighting effects for indoor spaces, especially for various exhibition halls.
Lantern: Above the central exhibition hall is an inverted conical skylight with large louvered windows that bring natural light into the tall central exhibition hall, creating a grand atmosphere of the hall. The top louvers can be adjusted, and the reflection of the inverted cone makes the light softer and more comfortable.
Diamond: The building roof is adorned with seven beautiful diamond shaped skylights. During the day, it directs sunlight into the exhibition hall on the second floor.
The roof of the temporary exhibition hall is a horizontal glass skylight with an oval shaped rooftop garden in the middle.
There are circular skylights on the roofs of the southwest and southeast corners of the building, which are irregularly arranged to create interesting ceiling lights in the indoor space.
There is a curved strip window along the middle of the exterior wall of the building, which provides soft natural lighting for the second floor exhibition hall.
There is a horizontal strip skylight along the top edge of the building, which provides natural light illumination for the third floor exhibition hall.
11.2 Constant temperature and humidity air environment
Due to the fact that this project requires a relatively large number of building functional rooms with temperature and humidity control throughout the year, a four pipe water system is used for air conditioning hot and cold water, with air conditioning chilled water and air conditioning hot water supplied year-round. For rooms with high temperature and humidity accuracy requirements such as collection warehouses and exhibition halls, a fixed fresh air volume all air system is designed. The air conditioning unit will be equipped with functions such as fresh air filtration, pretreatment, mixing, electronic purification treatment, cooling, heating (reheating), humidification, ultraviolet disinfection, etc., to maintain the constant temperature and humidity requirements required for such rooms. Separate air conditioning systems are installed in the front area of the warehouse and the collection warehouse.
The pre-treatment of fresh air refers to heating the outdoor fresh air introduced in winter, mixing it with return air, then subjecting it to secondary heating treatment, and finally humidifying it to ensure the relative humidity requirements of the supply air. In summer, the outdoor fresh air is first cooled and dehumidified, then mixed with the return air, undergoes secondary cooling and dehumidification, and finally undergoes reheating treatment to ensure that the temperature difference of the supply air is not too large, meeting the control requirements of temperature and humidity accuracy. If there is no pre cooling and dehumidification of fresh air, when it rains continuously in summer, a single cooling and dehumidification of mixed air may not reduce the supply air humidity to below 50%.
The dedicated unit for constant temperature and humidity with separate independent cold and heat sources is suitable for individual, small-sized rooms with constant temperature and humidity functions. This project requires a relatively large number of building functional rooms with temperature and humidity control throughout the year. If a dedicated constant temperature and humidity unit with separate independent cold and heat sources is also used, there will be many outdoor units. The scattered arrangement of too many outdoor units can damage the outdoor environment and facade effect of the building, while the initial investment and operating costs of the equipment are high.
On page 48 of the bidding documents, it is required that the temperature in the basic display area should be 20 ℃± 1 ℃, and the humidity should be 50% ± 5%. We believe that the above indoor environmental requirements are appropriate in winter, but not in summer. Calligraphy, painting, and cultural relics are much less sensitive to temperature than to relative humidity, but it is important to avoid significant temperature changes in a short period of time. So there is no need to require the entire exhibition hall to maintain an indoor environment of "temperature 20 ℃± 1 ℃, relative humidity 50% ± 5%" in summer. Otherwise, the energy consumption of air conditioning in summer will be astonishing, and providing visitors with an indoor environment with a temperature of 20 ℃± 1 ℃ and a relative humidity of 50% ± 5% during summer is also not suitable. Most art museums and galleries internationally do not provide such indoor environments during summer. For a very small number of special exhibitions, only a separate display cabinet needs to be provided, without requiring the entire exhibition hall to maintain this unreasonable indoor environment. So our determination of summer interior design parameters for the exhibition hall in the interior design parameter table is not completely consistent with the requirements of the bidding document. This is to clarify.
11.3 Security Prevention System
The security and prevention system is one of the most important systems in art museums, and it is the most important means to ensure the safety of art museum property. The design of security measures should not only meet its own purpose, but also serve as an auxiliary means to ensure personal safety in emergency situations such as fires. Therefore, the security system of this project adopts a fully digital system, utilizing modern computer technology, network technology, distributed automatic control technology, and digital image processing and compression technology. It adopts a structured and networked security prevention system, which is compatible and scalable. It should include the following components:
A. The building perimeter monitoring system monitors the environment and places around the building through a television monitoring system installed on the building. It sends alarms and takes corresponding preventive measures against moving targets invading the surrounding area through electronic walls.
B. Integrate with the old building and install anti intrusion devices on the exterior walls of the entire building.
C. Install two or more anti intrusion devices in valuable exhibitions and storage areas, and install anti intrusion devices in passages, doors, and windows leading to the area.
D. Install anti intrusion alarm devices in particularly important display cabinets.
E. Set up a monitoring system in public areas that mainly relies on closed-circuit television surveillance and is supplemented by entrance and exit channel control.
F. Parking lot management fee system.
G. Set up a wireless patrol system.
H. Set up wireless and wired intercom systems specifically for security purposes.
I. Establish a digital image processing and storage database system.